Fundatiunea Universitara CAROL I
The “Carol I” University Foundation
Biblioteca Centrala Universitara, monument de patrimoniu distrus in timpul evenimentelor din decembrie 1989, a necesitat un indelungat si complex proces de refacere si modernizare.
Cunoscutul corp de cladire, atent renovat, a fost redeschis in anul 2008, ocazie cu care si-a recapatat denumirea de „Fundatiunea Universitara Carol I“.
Stralucirea de odinioara a putut fi recuperata gratie vastei experiente a specialistilor in lucrari de modelaj, ipsosarie, stucomarmura, tamplarie monumentala, vopsitorii decorative, formati in lucrari similare realizate anterior de firma noastra.
The “Carol I” Library of the University Foundation, or the Central University Library of Bucharest, as it is better known, another Romanian Patrimony monument, was extensively damaged during the December 1989 events and subsequently required complex and painstaking repair and modernisation work.
The Central Building of the Central University Library was re-opened in 2008, receiving its former name of the “Carol I” University Foundation.
The regaining of the former splendour of the Library was due to our experts in plaster mouldings, plasterwork, stucco-marble work, exquisite carpentry and joinery, and decorative painting with vast expertise gained from the previous works carried out by Aedificia Carpati.
Institutul National pentru Fizica Pamantului
The National Institute for Earth Physics of Bucharest
O alta lucrare de referinta a companiei noastre este Institutul National pentru Fizica Pamantului. Constructia este formata din doua cladiri P+1 si corp de legatura, avand destinatia de sediu administrativ, sala de observatii si masuratori seismice, biblioteca, birouri si laboratoare.
Suprafata desfasurata: 2.240 mp.
Lucrarea a fost premiata cu Trofeul Calitatii.
Durata de executie: 11 luni
Another reference construction of our Company is the National Institute for Earth Physics. The complex consists of two 2-storey blocks linked by a connection block, all totalling 2,240 square meters of built area. The building hosts the administrative quarters, the centre of seismic observation and measurements, the library, and various chambers and laboratories.
The project received the Quality Trophy award.
The construction lasted for 11 months.
…citeste articolul integral in Revista Constructiilor nr. 200 – martie 2023, pag. 10, 36